News Channel

Historico

2026

  • Sacyr begins work on line 2 of the Sao Paulo in Brazil

    22/01/2020

    Sacyr begins work on line 2 of  the Sao Paulo in Brazil

    Sacyr Infrastructures and Engineering has begun construction work on lot 1 of line 2, also known as the green line, between Vila Prudente and Dutra. The 7.3 km.-long section is being built for the company Metropolitano de Sâo Paulo, Brazil.

    The work has begun following the signing of the service order by the Sâo Paulo Governor, Joâo Doria, and the Secretary of Metropolitan Transport, Alexandre Baldy.

    The consortium, consisting of Sacyr Infrastructures and Engineering, Galvâo Engenharia and SA Paulista, will carry out the project with a budget of 443.2 million euros (1.9 billion Brazilian reals) and a construction period of 69 months.

    The works will benefit the more than 300,000 daily users of the Sâo Paulo metro.

    Tunnels, ventilation shafts and the Vila Formosa station

    The contract includes the construction of a double-track tunnel of 7.8 km in length and 11.69 m in diameter with an EPB tunnel boring machine; a set of tunnels of 1.8 km in length for parking trains to be executed using the Austrian method; the Vila Formosa station and the bus terminal and the Rapadura complex with a base for train maintenance and parking; five ventilation shafts with diameters between 12 and 15 meters and the ballastless track superstructure.
    Other projects in Brazil

    In the Sâo Paulo metro, Sacyr has already successfully executed other contracts such as the stations of Vila Prudente, Estación Vila Uniao, Vila Tolstoy, Camilo Haddad and Sao Lucas.

    At present, it is building the new Jardin Colonial station of the 15 line- Plata, of the Sâo Paulo Metro. And in Fortaleza, it is working on the city’s East metro line.

    Download PDF

This website uses its own and third-party cookies to improve the user experience and analyze their behavior in order to improve the service offered.
You can consult additional information about the cookies installed on our Cookies policy.

Cookie Settings

Cookie declaration

TECHNICAL

These cookies are exempt from compliance with article 22.2 of the LSSI in accordance with the recommendations indicated by the European authority on privacy and cookies. In accordance with the above and although configuration, acceptance or denial is not possible, the editor of this website offers information about them in an exercise of transparency with the user.

  • Name: LFR_Session_STATE_*, Provider: Liferay, Purpose: Manages the session as a registered user , Expiration: Session, Type: HTTP

  • Name: GUEST_LANGUAGE_ID, Provider: Liferay, Purpose: Determines the language with which you access , to show the same in the next session, Expiration: 1 year, Type: HTTP

  • Name: ANONYMOUS_USER_ID, Provider: Liferay, Purpose: Manages the session as an unregistered user , Expiration: 1 year, Type: HTTP

  • Name: COOKIE_SUPPORT, Provider: Liferay, Purpose: Identifies that the use of cookies for the operation of the portal, Expiration: 1 year, Type: HTTP

  • Name: JSessionID, Provider: Liferay, Purpose: Manages login and indicates who is using the site, Expiry: Session, Type: HTTP

  • Name: SACYRGDPR, Supplier: Sacyr, Purpose: Used to manage the cookie policy , Expiration: Session, Type: HTTP