Project C10 - Expansion of the Cartagena Refinery

SacyrFluor provided project management services (PMC) to expand and modernize Repsol’s Refinery in Cartagena, located on the east coast of Spain.
The PMC focused on the management of interfaces with various  licensors and contractors for engineering and procurement, providing the Basic Engineering for the “open art” units, ordering long-term equipment and helping Repsol to prepare the estimate for project authorization.
Furthermore, Sacyr Fluor was also responsible for engineering, procurement, and the supervision of offsite construction, facilities, and revamps. The work undertaken by Sacyr Fluor encompassed approximately one quarter of the total investment.
The main objective of the expansion and renovation project was to obtain a refinery for 200,000 BPD of complete conversion, capable of processing heavy/sour crude oils. 
To this end, a further 20 new processing units and 10 utility units were added, and other existing units were also modified. Currently, the Refinery is in a good position to meet growing market demand for quality middle distillates.
The project surpassed the operating targets with regard to the consumption of hydrogen and energy, and also complied with the strict environmental requirements of the EU and Spain. Just as importantly, the project made a positive contribution to the community by maximizing the use of local labor, suppliers, and local contractors, and simultaneously implemented high level standards in design and construction.
SacyrFluor helped Repsol to secure the environmental permit required in March 2008 and managed all the permit concession activities for the project, which required in-depth knowledge of local codes and regulations. The new refinery borders an environmentally sensitive area, and the conservation of native flora and fauna has been a concern. Furthermore, to minimize the leveling of naturally  sloping terrain in the Valle de Escombreras, the site has several terraces, which vary in altitude from 35.5 meters above sea level for the Hydrocracker  unit, to 22.5 meters for the sulfur handling area, which created unique challenges in the design and construction.

 

  • Name: Project C10 - Expansion of the Cartagena Refinery
  • Construction Company: Sacyr Fluor S.A.
  • Client: Repsol Petróleo S.A
  • Execution Dates:  2006 - 2011

2012

National Engineering Award

> 60

Years old

3.150

Investment in refining (M€)

> 200.000

Barrel per day

This website uses its own and third-party cookies to improve the user experience and analyze their behavior in order to improve the service offered.
You can consult additional information about the cookies installed on our Cookies policy.

Cookie Settings

Cookie declaration

TECHNICAL

These cookies are exempt from compliance with article 22.2 of the LSSI in accordance with the recommendations indicated by the European authority on privacy and cookies. In accordance with the above and although configuration, acceptance or denial is not possible, the editor of this website offers information about them in an exercise of transparency with the user.

  • Name: LFR_Session_STATE_*, Provider: Liferay, Purpose: Manages the session as a registered user , Expiration: Session, Type: HTTP

  • Name: GUEST_LANGUAGE_ID, Provider: Liferay, Purpose: Determines the language with which you access , to show the same in the next session, Expiration: 1 year, Type: HTTP

  • Name: ANONYMOUS_USER_ID, Provider: Liferay, Purpose: Manages the session as an unregistered user , Expiration: 1 year, Type: HTTP

  • Name: COOKIE_SUPPORT, Provider: Liferay, Purpose: Identifies that the use of cookies for the operation of the portal, Expiration: 1 year, Type: HTTP

  • Name: JSessionID, Provider: Liferay, Purpose: Manages login and indicates who is using the site, Expiry: Session, Type: HTTP

  • Name: SACYRGDPR, Supplier: Sacyr, Purpose: Used to manage the cookie policy , Expiration: Session, Type: HTTP